Saturday, May 23, 2009

Switch Active Or Neutral

fresh news!

It's time that we have not given new, since we were very busy!


So now, the shower is now complete. I had to start over because we were not satisfied with the first test, but this time it succeeded! The floor and back wall are stones river. There is also a small niche in rollers to deposit bottles. The ceiling is paneled in cedar oil, like all the bathroom beyond.





Then we built dls two bedrooms and bathroom upstairs. It remains now to draw the joints, floors and walls to install at painting.


Right now, we're dying to ask the beams and wainscoting to the ceiling of the ground floor. And soon we begin the third layer of plaster inside. We will give you fresh news!

0 comments:

Post a Comment