Saturday, May 23, 2009

Switch Active Or Neutral

fresh news!

It's time that we have not given new, since we were very busy!


So now, the shower is now complete. I had to start over because we were not satisfied with the first test, but this time it succeeded! The floor and back wall are stones river. There is also a small niche in rollers to deposit bottles. The ceiling is paneled in cedar oil, like all the bathroom beyond.





Then we built dls two bedrooms and bathroom upstairs. It remains now to draw the joints, floors and walls to install at painting.


Right now, we're dying to ask the beams and wainscoting to the ceiling of the ground floor. And soon we begin the third layer of plaster inside. We will give you fresh news!

Monday, May 11, 2009

Community Service Reference Sample

A waterfall pond fish for our fish for our

You once said that we did not put equipment in our pool for fish that require an electrical connection. But this time we still wanted to establish a aquarium pump that was recovered from grandma.

It is not for filtration because our ornamental pond works very well without filtration for a year now. And the water is of very good quality, it is very clear. We clearly see the fish that do not complain about the quality of water and are in very good shape!

is to make a waterfall. So we just connected the pump, put the pump in water and positioned a pipe bubbler aquarium filter pump outlet with the other end of pipe out of the water. Thus, water is sucked into the filter pump, pushed into the transparent tube waterfall and spring, with a fountain effect at the center of the pond to fish. it's been a pretty small and creates a rustle, like the sound of a small waterfall or a stream. It's very nice.

After unplugging it little and put away the outer extension of. Il faut aussi dire que notre installation est dans une loggia sans risque de pluie dessus. It still ranks all, except the pump, when not in use for some time.

The installation of the pump is underwater and unseen. We positioned the hose so it does not show. The hardest thing to do is take a position that creates the most beautiful waterfall and noise most enjoyable.

Sunday, February 22, 2009

Dry Cough For 5 Days Baby

shower

Robert began working on the shower for some time. This has not always been easy, but he discovered a talent for mainta tiler!
As we had no showers either at our old house teepee, we begin to be slightly tanned to take baths! It's coming!

Robert who install tiles on the wall he had to start over.
For rectangular tiles at low prices, we cut the square tiles into rectangles! And voila!

tiler My favorite!
Have you noticed the pebbles! Wow!




Cause Of Blood Blister On Tonsil

cooking


The kitchen is the most advanced part of the house. It remains only to ask the ceramic floor and backsplash, and then ask the kicks.
Cases were built by Nicola, who handled the carpentry aspect, as well as myself, who looked after the sandblasting and dyeing, in addition to the design aspect. They are made from local maple, but melamine to the non-visible ... We try to marry our soul and our little green budget ... The counters are made of maple and stainless steel. Indeed, we recovered a stainless steel countertop with a pharmaceutical factory and have designed the island as a function thereof.


is the result:

the overview

The butcher block

island
the island
recovered from the counter a pharmaceutical plant ... and laboratory faucet to match!
the lunch counter



and small laundry area that sits in the kitchen.
Despite the opinions shared by all, me I am very happy that it is located in the kitchen!
It's so convenient!